Weather and construction schedule

Weather and the Construction Schedule

Professional Pool Company — How Florida Weather Impacts Your Pool Build

Weather plays an important role in the construction timeline of any outdoor project, especially in Florida’s unpredictable climate. While Professional Pool Company works diligently to maintain schedules, certain phases of pool construction must be completed in safe, dry, and stable conditions.

This article explains how weather may affect your project and what we do to minimize delays.


1. Why Weather Matters in Pool Construction

Pool construction involves excavation, concrete, plumbing, electrical systems, and finishing materials that are sensitive to:

  • Heavy rain
  • Lightning
  • High winds
  • Low temperatures
  • Flooded or overly saturated soil

For safety, quality, and engineering reasons, some phases cannot proceed in unsafe or unsuitable conditions.


2. Florida’s Most Common Weather Impacts

Rain

  • Saturated soil can cause excavation collapse
  • Rain can flood a dig site
  • Wet conditions can slow steel, plumbing, and decking work
  • Gunite cannot be applied in heavy rain

Lightning

  • All outdoor crews must stop immediately
  • Electrical bonding and equipment phases cannot occur

Wind

  • Screen enclosure installation requires calm winds
  • Crane operations (if used) may be postponed

Extreme Heat

  • Certain finish materials require controlled timing
  • Gunite curing may need additional hydration or scheduling changes

Cold Weather

  • Interior finishes (pebble, quartz) cannot be installed below certain temperatures
  • Heaters cannot be activated until chemistry stabilizes


3. How Weather Affects Each Construction Phase

Excavation

Heavy rain or saturated ground can delay digging to avoid cave-ins or unstable walls.

Steel Installation

Light rain is acceptable, but standing water or lightning stops work.

Plumbing & Equipment

Work pauses during lightning or harsh conditions to ensure safety.

Gunite/Shotcrete Shell

Gunite must be applied in dry-to-moderate weather.

It cannot be applied during:

  • Heavy rain
  • High wind
  • Freezing temperatures

Decking & Hardscape

Rain affects concrete curing, paver setting, drainage grading, and saw-cutting.

Screen Enclosure

High wind or storms delay aluminum installation and mesh panel stretching.

Interior Finish & Start-Up

Interior finishes cannot be applied in:

  • Heavy rain
  • Very cold temperatures
  • High humidity combined with wind


4. Weather Delays Are Normal — Not a Sign of Problems

In Florida, most projects experience at least one weather delay.

This is completely normal and protects:

  • Structural integrity
  • Finish quality
  • Equipment safety
  • Your warranty

Rushing work in unsafe conditions can create costly complications later.


5. How We Minimize Weather Delays

Professional Pool Company uses several strategies to reduce disruption:

  • Monitoring radar and forecasting daily
  • Planning high-sensitivity phases around clear weather windows
  • Using proper drainage management at each phase
  • Protecting open excavation areas
  • Securing materials and equipment ahead of storms
  • Rescheduling to the next available clear-day window

Our goal is always to move your project forward safely and efficiently.


6. Your Project Manager Will Keep You Updated

If weather affects your schedule, your project manager will notify you and explain:

  • Which phase is impacted
  • When the next weather-safe window is expected
  • How the revised schedule will look
  • Whether any prep work can continue in the meantime

You’ll never be left guessing.


7. Quality Comes Before Speed

While we work hard to stay on schedule, we never compromise quality or safety.

Choosing the right weather conditions ensures:

  • Stronger concrete
  • Correct curing
  • Proper drainage slopes
  • Clean deck work
  • A flawless interior finish
  • A longer-lasting pool

A few extra days of patience often results in years of better performance.


Have Questions About Weather & Your Project?

Your project manager can explain your specific timeline and next steps anytime.

👉 Start your free 3D design or message our team today.


Need help right now?

Call us at 321-252-7371 or schedule a design consultation at this link.


© 2025 Professional Pool Company. All rights reserved.

Updated on: 28/11/2025

Was this article helpful?

Share your feedback

Cancel

Thank you!