# Our 14-Stage Pool Construction Process

# Our 14-Stage Pool Construction Process
Professional Pool Company uses a documented, stage-by-stage build system so your project stays organized, compliant, and predictable — from engineering to final pool school.
[Start a 3D Design](https://propoolco.com/design-your-pool/) [Client Portal](https://propoolco.com/client-portal/)
## Stage 1 — Engineering & Permitting
We confirm site constraints, finalize design details, and prepare engineered plans for permit submission.
* Survey review + layout feasibility
* Engineered plan set
* Permit submission + tracking
## Stage 2 — Layout
We mark your pool and deck footprint on-site to confirm placement before excavation.
* Set elevations + reference points
* Confirm access and setbacks
* Homeowner confirmation
## Stage 3 — Excavation
We excavate to engineered depths and prep the base for steel and plumbing.
* Dig to profile (3’–6’ or as designed)
* Haul-off / spoil management
* Jobsite safety setup
## Stage 4 — Steel & Main Drains
Steel is installed to spec and main drains are set for safe circulation.
* Rebar cage installed + tied
* Main drains set (VGB compliant)
* Bonding prep as required
## Stage 5 — Pre-Plumbing
We run plumbing lines and set suction/returns for performance and serviceability.
* Skimmer + suction lines
* Returns + features (if selected)
* Pressure test prep
## Stage 6 — Gunite
The structural shell is applied at high PSI to create the pool’s long-term foundation.
* Shell shot + shaped
* Benches / steps / sunshelf formed
* Curing guidance provided
## Stage 7 — Pre-Grade & Equipment Set
We prep grades and set equipment locations so everything fits and drains correctly.
* Equipment pad location verified
* Rough grades established
* Utility coordination
## Stage 8 — Tile & Coping / Cantilever
Waterline tile and coping/cantilever are installed for finish quality and clean lines.
* Tile installed + leveled
* Coping/cantilever formed + poured
* Alignment checks
## Stage 9 — Decking
Decking is installed per the approved selection (concrete acrylic, pavers, travertine, etc.).
* Bond wire as required
* Drainage + slope checks
* Finish surface installed
## Stage 10 — Electrical & Bonding
Electrical connections and bonding are completed to code so the system is safe and reliable.
* Bonding verification
* GFCI requirements met
* Equipment power hookup
## Stage 11 — Screen (If Applicable)
If your project includes a screen enclosure, it’s installed to engineered wind-load requirements.
* Footers / tie-ins (if needed)
* Structure install
* Door hardware checks
## Stage 12 — Safety Requirements
We confirm required Florida safety barriers (fence, alarms, etc.) are in place.
* Barrier compliance check
* Alarm / latch verification
* Inspection readiness
## Stage 13 — Interior Finish & Startup
Interior finish is applied, the pool is filled, equipment is started, and water is balanced.
* Finish applied + fill coordination
* Startup + chemical balance
* Pool school + care guidance
## Stage 14 — Final Inspection & Orientation
We coordinate final inspections and complete your final orientation walkthrough.
* Final inspection scheduling
* Punch list closeout
* Owner manuals in Client Portal