Building a pool in Brevard County

Building a Pool in Brevard County

Professional Pool Company — What Homeowners Need to Know Before Building a Pool in Brevard County, FL

Brevard County has its own permit requirements, engineering standards, and inspection procedures that determine how long it takes to build a pool. This guide explains everything you need to know about building a pool in Brevard County, including county rules, required documents, timelines, inspections, and expectations.


1. Overview of Pool Construction in Brevard County

Brevard County is known for:

✔ Quick permitting compared to other Central Florida counties

✔ Strict drainage and stormwater requirements

✔ Frequent elevation inspections

✔ Flood-zone evaluations in coastal areas

✔ HOA-heavy neighborhoods (Viera, Melbourne, Suntree)

Most pools take 3–5 weeks to receive a permit depending on workload and corrections.


2. What Brevard County Requires Before a Pool Permit Is Submitted

To submit your pool permit, we must include:

1. Engineered Pool Plans

Stamped structural drawings showing steel, elevations, beam heights, and shell details.

2. Property Survey

Must show:

  • Easements
  • Buildable area
  • Drainage patterns
  • Utility lines
  • Elevation (bench mark preferred)

3. Site Plan Drawing

Shows:

  • Pool placement
  • Setbacks
  • Deck footprint
  • Equipment location
  • Access path

4. Drainage Plan (when required)

Some Brevard jurisdictions require:

  • Swale maintenance
  • Grade flow patterns
  • Water runoff calculations

5. HOA Approval (if applicable)

HOA approval is typically needed in:

  • Viera
  • Suntree
  • Merritt Island HOA communities
  • Palm Bay subdivisions

Construction cannot begin until HOA and county approval are both complete.


3. Typical Permitting Timeline in Brevard County

Average Review Time:

3–5 weeks

Includes:

  • Intake review
  • Building review
  • Zoning review
  • Environmental/erosion review (if needed)
  • Floodplain review (in certain areas)
  • Corrections (if required)

Faster Than:

Orange, Osceola, Volusia

Brevard is generally predictable and efficient with pool permits.


4. Property Considerations Unique to Brevard County

1. Flood Zones Near the Coast

Pools in flood zones may require:

  • Elevation certificates
  • Special engineering notes
  • Additional drainage planning
  • Deck elevation adjustments

2. Utility Easements

Many Brevard lots have rear utility easements that limit how far back a pool can be placed.

3. Drainage Flow Requirements

Brevard often requires that pools and decks do not alter existing drainage flow to adjacent homes.

4. Space for Equipment

County rules require equipment to meet setbacks, usually:

  • 5 ft from property lines
  • Clear access for service

5. Sewer/Septic Considerations

If you have septic:

  • Setbacks must be met
  • Drainfields must be shown
  • Additional engineering may be required


5. Inspections Required by Brevard County

During pool construction, Brevard County requires:

1. Steel Inspection

Before gunite is applied.

2. Electrical Bonding Inspection

Ensures safety bonding is correct.

3. Plumbing Pressure Test Inspection

Confirms plumbing lines hold required pressure.

If installing pavers, concrete, or enclosure footers.

5. Final Inspection

Includes:

  • Safety barrier compliance
  • Pool equipment operation
  • Alarms or fencing verification
  • Deck drainage
  • Access protection

No pool can be filled until the inspector approves all required phases.


6. Brevard County Safety Requirements

Brevard follows Florida Building Code pool safety laws:

✔ Acceptable safety barriers:

  • 4-foot perimeter fence
  • Baby barrier around pool
  • Door/window alarms leading to pool area
  • Screen enclosure
  • Self-latching gates

A safety solution must be installed before the final inspection.


7. Expected Construction Timeline

After permitting, construction typically includes:

  1. Excavation – 1–2 days
  2. Plumbing & Steel – 2–4 days
  3. Inspection phase – 1–3 days
  4. Gunite – 1 day (+ curing time)
  5. Tile & Coping – 2–4 days
  6. Deck installation – 3–7 days
  7. Interior finish & startup – 2–3 days

Average total construction time:

10–16 weeks depending on weather and material choice.


8. County-Specific Tips for a Smooth Build

✔ Submit HOA early

Some HOA boards meet only once per month.

✔ Have your survey ready

Missing surveys delay engineering.

✔ Understand drainage

Brevard takes stormwater seriously; backyard grading matters.

✔ Keep access clear

Equipment must pass through side yards carefully.

✔ Expect inspection scheduling gaps

Most inspections are next-day, but seasonal delays may occur.


9. Summary: Building a Pool in Brevard County

Homeowners can expect:

✔ 3–5 week permitting timeline

✔ Clear county guidelines

✔ Important drainage and elevation considerations

✔ Multiple inspections throughout the build

✔ Strict safety barrier requirements

✔ Predictable construction flow after approvals

Brevard is one of the more straightforward counties for pool construction, but proper engineering and drainage planning are essential for fast approval.


Building in Brevard County? We Handle Every Step.

Professional Pool Company manages:

✔ Engineering

✔ Permitting

✔ HOA coordination

✔ County inspections

✔ Safety compliance

✔ Full construction process

👉 Contact us anytime to start your Brevard County pool build.


Need help right now?

Call us at 321-252-7371 or schedule a design consultation at this link.


© 2025 Professional Pool Company. All rights reserved.

Updated on: 29/11/2025

Was this article helpful?

Share your feedback

Cancel

Thank you!